Wow, it looks like that i forgot to post the news in this garage. Sso:
Engine is complete with every tube and cable, ready to run, i started it already last weekend, and had it run about half an hour.
Some new stuff for the car, my individual coilovers, my brand new OEM 535i exhaust system( expensive as hell), and some brake stuff. My brake master cylinder is from a 535i, and the brake calipers are from an e34 530i V8, everything is sanded and repaired.
My rear suspension, the subframe is from a 528i(m30b28), and the trailing arms from a E34, everything is sanded and repainted, all of the pitman arms, bearings will be changed to new ones.
And finally, the new struts mounted. The biggest drop is under about 2 centimeters from the last one(this):
I have to change the tyres from 225/45 to 215/45(225/40 would be the perfect, but it's hard to find in Hungary) and to put about 10mm spacers to the front to make enough space for the springs.
And now i am waiting for the new output shafts.
I'm sorry that my English is not the best, i'm tired and this is the last day before my semester, i'm a little bit drunk, i just wanted to post my progress. And now back to the party.